COMMERCIAL PROPOSAL

 

         Note:

         The amount of the days is depended on the complexity of the task.

            References:

            ICAO Annex 4 – Aeronautical Charts;

            ICAO Annex 5 – Units of Measurement;

            ICAO Annex 14 Vol 1. – Aerodrome Design and Operations;

            ICAO Doc 8168 Vol 2. – Construction of Visual and Instrument Flight Procedures;

            ICAO Doc 8697 – Aeronautical Charts Manual;

            ICAO Doc 9905 – Required Navigation Performance Authorization Required
(RNP AR) Procedure Design Manual;

            ICAO Doc 9906 Vol 5. – Flight Validation of Instrument Flight Procedures;

            ICAO Doc 10068 – Manual on the Development of a Regulatory Framework for Instrument Flight Procedure Design Service.

 

Меню